To compare two drilling technologies fairly, we first had to measure what one crosscut really uses. We instrumented it and put the numbers on a daily dashboard.
3 utilities
measured live on one crosscut: air, water and power
How to read this figure
This was a study and design project. No saving is claimed.
2025
The problem
What was going wrong.
Nobody could say what a single crosscut consumed in air, water and power, so claims about one drill being cheaper to run than another could not be tested.
What we did
- Installed a portable compressed-air flow and pressure meter, an ultrasonic water meter and a three-phase power meter on one crosscut.
- Built a daily dashboard showing consumption through the day, whether a blast was likely, and the expected production.
- Designed a side-by-side trial: one month on pneumatic drills, then one month on electro-hydraulic drills, in the same crosscut.
The result
What the client got.
The mine and the manufacturer had a measured, agreed basis for comparing the two technologies.
What we found
- Consumption for a single crosscut became visible day by day.
- From the air used in the drilling shift, the dashboard judged each day whether a blast was likely.
Try the daily dashboard
Pick a day and a measurement
Loading the dashboard…
Laid out like the dashboard the client used, with two weeks of the project's own measurements. Dates and names are removed and the figures are rescaled.
More work
Other case studies.
Technology comparison
R45M
modelled cost difference between the two drilling options over two years
Pneumatic or electro-hydraulic rock drills?
A PGM mine, Limpopo
Read the case studyCompressed air
R7M to R10M
a year, opportunity identified
Compressor scheduling and a compressed-air wastage roadmap
A PGM mine, Limpopo
Read the case studyService water
99%
average accuracy of the model against the real system
A digital twin of a deep-level service-water system
A deep-level gold mine, Gauteng
Read the case study
Let's find what your mine is losing.
Tell us about the site. We will come and look, and tell you plainly what we think it is worth fixing.